(Lake Placid, NY) The project included the installation of four 350KW Level 3 charging stations and two ChargePoint Power Blocks. These Power Blocks are designed for scalability, allowing power output adjustments by adding or removing power modules. To support this advanced setup, we also installed a 2000KVA transformer provided by the local utility and a 3000A switchboard to ensure optimal power distribution. At Mach 1 Electric, no project is too complex. Whether it's EV charging stations, large-scale power systems, or custom electrical solutions, we’ve got the expertise to get the job done right!