UTICA FORD
(Utica, NY) To power the new chargers, we installed a 1200A service connected to an existing utility pole on-site. However, the utility pole’s distance from the ultimate charger locations required extensive construction and coordination to ensure a seamless and efficient installation.
For this project, we installed a combination of Level 2 and Level 3 chargers, providing the dealership with flexibility in charging speeds to meet their logistical and operational needs. At Mach 1 Electric, we specialize in delivering tailored EV charging solutions for businesses of all sizes!