(New London, CT) We installed (2) dual port Level 2 stations for the town’s commuter lot, so the residents could charge their EV’s while they were at work, or stopping in town to eat/shop. We were able to utilize the parking lot’s existing power source, and trench for conduit to be run behind the curb of the parking lot and to the final charger locations. We formed and poured (2) concrete pads for each station to mount on and installed (2) protective bollards as well. We also commissioned each station in order for them to communicate with the site host and end user. For this install, we used (2) Chargepoint Level 2 stations.